Marina Del Rey
Tile resetting and power wash
His crew took the existing concrete tiles off, installed 2 layers of 30 lb felt, reinstalled the tiles and power-washed them. Also, they installed 3 dormers.
It took only 3 days to complete the job.
Originally, I was planning to replace the existing tile roof. However, Mike of Above it All Roofing told me that the existing concrete tiles could last for a long long time and did not need to be replaced. So we decided to have them power washed. This saved us about $4,000.
I am very happy with the price and their work.